Finishing Projects
Nautilus Club
10 years, 7 months ago Posted in: Finishing Projects, Projects Comments Off

Located at Marellias in beirut,Dolmen Contracting executed a subcontract from (Bureau Joe Sagbini) for gypsum works.

The tiles used for false ceiling is Danogips ceiling system ,the different size of planks are available either perforated or plain, the perforation patterns and sound absorption felt on the back of the plank mean that different acoustic. the face of the plank is supplied with a white water based finish.

A free span of up to 2,400 mm can be achieved between perimeter trim or main runners without the need of further suspension from the structural ceiling.

Comments are closed.

  • Copyright © 2014 Dolmen Development. All rights reserved.